AN HA INDUSTRIAL PARK
|
2
|
Location
|
Located in Binh Chanh commune, Binh Chanh district, Ho Chi Minh City
|
3
|
Map
|
|
4
|
Scale, land area
|
4.1
|
Planning area
|
123,51 ha
|
4.2
|
Actual area
|
|
+ Occupied
|
|
|
+ Available
|
|
4.3
|
Number of businesses and projects in operation
|
|
+ Domestic business
|
|
|
+ FDI business
|
|
|
+ Main operating industries
|
|
5
|
Advantage of location
|
5.1
|
Transpotation connection
|
- 22km from the city center.
- 20 km from Tan Son Nhat airport
- 27km from Hiep Phuoc port.
|
5.2
|
Insfrastructure
|
The internal road system is paved with hot asphalt concrete
- Expected design load: 30 tons
- Main trunk road (North South) width: 30m
- Main trunk road (East-West) width: 75m.
- Regional roads: width of 20-30 m.
|
5.3
|
Others
|
|
6
|
Land use term
|
|
7
|
Technical infrastructure
|
7.1
|
Electricial System
|
- National grid system
- Voltage level: 22-15/ 0.4 kV ( ±10%)
- Frequency : 50 (± 0.5) Hz
- Capacity : 80 MVA
|
7.2
|
Water supply and drainage system
|
- Source of supply: Cho Lon Water Supply Joint Stock Company
- Factory capacity: 300,000 m3/day and night
- There is also an underground water source from Vinh Loc A commune, Binh Loi commune
|
7.3
|
Fire protection and fighting system
|
- Wastewater after treatment reaches column A according to national technical regulation QCVN24:2009/BTNMT.
- Treatment capacity: 5,000 m3/day and night
|
7.4
|
Status of investment, completion of infrastructure
|
- The post and telecommunications network ensures domestic and international communication.
- Connected to VNPT-HCMC telecommunications network.
|
7.5
|
Fire protection and fighting system
|
|
7.6
|
Status of investment, completion of infrastructure
|
|
8
|
Human Resources:
|
8.1
|
Local labor
|
|
8.2
|
Labor in the vicinity
|
|
8.3
|
Training for main occupations
|
|
9
|
Social Infrastructure
|
|
10
|
Supporting Services
|
|
11
|
Attracted investment fields
|
11.1
|
Priority areas
|
|
11.2
|
Others
|
|
12
|
Land for lease, factory and infrastructure use fee
|
12.1
|
Rental of land for lease
|
125-140USD/m2 (excluding VAT 10%) depending on the location of the lot until 2058
|
12.2
|
Rental of factory for lease
|
|
12.3
|
Infrastructure usage fee
|
|
12.4
|
Payment methods
|
|
13
|
Construction price
|
13.1
|
Office
|
|
13.2
|
Standard factory
|
|
13.3
|
Other items
|
|
14
|
Investment Expeneses
|
14.1
|
Electricity price
|
- Peak- hour (18:00 – 2:00) 1,999VND/kWh
- Off-peak hours (22:00 – 06:00) 683 VND/kWh
- Normal hours (06:00 – 18:00) 1,093 VND/kWh
(price above not including VAT)
|
14.2
|
Water price
|
0.5 USD/m3/month (price excludes VAT)
|
14.3
|
Gas and coal price
|
|
14.4
|
Apartment and department rental price for foreigners
|
|
14.5
|
Labor cost:
|
|
+ Labor management and engineering
|
|
|
+ Workers and unskilled workers
|
|
|
+ Insurance
|
|
14.6
|
Transportation costs
|
|
14.7
|
Cost of waste (water) treatment
|
0.325USD/m3/month (calculated by 80% of water supply, input standard of domestic water type B, output standard of domestic water A).
|
14.8
|
Environmental protection fee
|
|
14.9
|
customs fees
|
|
14.10
|
Other costs and fees
|
Maintenance fee: 0.05 USD/m2/month (VAT not included).
|
15
|
Contact point
|
National One Stop Services and Investments Organization
Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.
- Ms Hien Do – 0908 069 399 –hien.dt@nso.com.vn
- Mr Cuong Phan – 0913 855 528 –cuong.pd@nso.com.vn
|