An Ha Industrial Park

Oct 27, 2021

Location: Binh Chanh District, HCMC

Total area: 123.51 ha

AN HA INDUSTRIAL PARK

1

Economic zone, Industrial Park, High Tech Park

AN HA INDUSTRIAL PARK

2

Location

Located in  Binh Chanh commune, Binh Chanh district,  Ho Chi Minh City

3

Map

 

4

Scale, land area

4.1

Planning area

123,51 ha

4.2

Actual area

 

+ Occupied

 

 

+ Available

 

4.3

Number of businesses and projects in operation

 

+ Domestic business

 

 

+ FDI business

 

 

+ Main operating industries

 

5

Advantage of location

5.1

Transpotation connection

- 22km from the city center.

- 20 km from Tan Son Nhat airport

- 27km from Hiep Phuoc port.

5.2

Insfrastructure

The internal road system is paved with hot asphalt concrete

- Expected design load: 30 tons

- Main trunk road (North South) width: 30m

- Main trunk road (East-West) width: 75m.

- Regional roads: width of 20-30 m.

5.3

Others

 

6

Land use term

 

7

Technical infrastructure

7.1

Electricial System

- National grid system
- Voltage level: 22-15/ 0.4 kV ( ±10%)

- Frequency          : 50 (± 0.5) Hz

- Capacity    : 80 MVA

7.2

Water supply and drainage system

- Source of supply: Cho Lon Water Supply Joint Stock Company

- Factory capacity: 300,000 m3/day and night

- There is also an underground water source from Vinh Loc A commune, Binh Loi commune

7.3

Fire protection and fighting system

- Wastewater after treatment reaches column A according to national technical regulation QCVN24:2009/BTNMT.

- Treatment capacity: 5,000 m3/day and night

7.4

Status of investment, completion of infrastructure

 - The post and telecommunications network ensures domestic and international communication.

- Connected to VNPT-HCMC telecommunications network.

7.5

Fire protection and fighting system

 

7.6

Status of investment, completion of infrastructure

 

8

Human Resources:

8.1

Local labor

 

8.2

Labor in the vicinity

 

8.3

Training for main occupations

 

9

Social Infrastructure

 

10

Supporting Services

 

11

Attracted investment fields

11.1

Priority areas

 

11.2

Others

 

12

Land for lease, factory and infrastructure use fee

12.1

Rental of land for lease

125-140USD/m2 (excluding VAT 10%) depending on the location of the lot until 2058

12.2

Rental of factory for lease

 

12.3

Infrastructure usage fee

 

12.4

Payment methods

 

13

Construction price

13.1

Office

 

13.2

Standard factory

 

13.3

Other items

 

14

Investment Expeneses

14.1

Electricity price

- Peak- hour (18:00 – 2:00) 1,999VND/kWh

- Off-peak hours (22:00 – 06:00) 683 VND/kWh

- Normal hours (06:00 – 18:00)   1,093 VND/kWh

(price above not including VAT)

14.2

Water price

0.5 USD/m3/month (price excludes VAT)

14.3

Gas and coal price

 

14.4

Apartment and department rental price for foreigners

 

14.5

Labor cost:

 

+ Labor management and engineering

 

 

+ Workers and unskilled workers

 

 

+ Insurance

 

14.6

Transportation costs

 

14.7

Cost of waste (water) treatment

0.325USD/m3/month (calculated by 80% of water supply, input standard of domestic water type B, output standard of domestic water A).

14.8

Environmental protection fee

 

14.9

customs fees

 

14.10

Other costs and fees

Maintenance fee:   0.05 USD/m2/month (VAT not included).

15

Contact point

National One Stop Services and Investments Organization

Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.

  1. Ms Hien Do – 0908 069 399 –hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 –cuong.pd@nso.com.vn

Tags