VSIP Hai Phong project is the fourth cooperation of VSIP Group - a capital contribution partnership between Becamex IDC (Binh Duong) and SembCorp Industries (Singapore). The project is located in the North of Cam River, Thuy Nguyen district, Hai Phong, with a scale of 1,600ha, with an investment of up to 1 billion USD.
Project operation period: from 2008 to 2058
Infrastructure: Waste treatment plant
Phase 1: 4,500m3/day
Total: 39,000m3/day and night
Substation: Total capacity 200 MVA
Stage 1: 54 MVA
Water supply plant: 69,000m3/day and night
Road system: 2 main roads of East-West Highway
6.1km long, wide: main road: 80m, 90m, branch road: 26m, 56m
North-South Boulevard: 4.8km long, 80m . wide
Standard factory: 1,700 m2; 2,550 m2; 2,750 m2
There are 9 ready-built factories.
Number of tenants: 25 guests
Land rental price (USD/m 2 /period): 125-155
RBF: 5.5-5.7USD/m2/month
BW RBF: 24,2ha (5.5USD/m2/month)
|