Thuan Dao Industrial Park

Oct 29, 2021

THUAN DAO INDUSTRIAL PARK

Investor: DONG TAM INDUSTRIAL JOINT STOCK COMPANY

Location: Ben Luc town, Ben Luc district, Long An province.

Area: 189.8ha

 

STRENGTHS

1. Convenient location: Thuan Dao Industrial Park locates at the center of Ben Luc town, Ben Luc district, Long An province.
Long An is considered as a “backyard” of Ho Chi Minh city and is the key and only trading gateway between the two major economic zones of the South and Mekong Delta.
2. Transportation advantages:
Thuan Dao Industrial Park is a hub for the national traffic system (road, airline, waterway and railway) easily and conveniently such as:
- Road: National Road 1A, Belt Road 3, Belt Road 4, Highway from HCMC – Trung Luong – Can Tho, provincial road 16.
- Airline: Tan Son Nhat International airport, Long Thanh International airport
- Waterway: Ben Luc Bourbon port, Long An International port, Hiep Phuoc Port; Cat Lai Port.
3. Term of land use:
Investor is entitled to use land for 50 years and does not have any other annual land payment to the Government.
4. HR- Training:
Thuan Dao is the only IP in Mekong Delta occupies 53% of Long An labor force with 30,000 workers compared to 47,000 workers of the whole province
5. Procedures of “one stop service”:
Investors are served with procedures of one stop service quickly and free of charge: investment certificate, tax code, seal, etc.
6. Free consulting service:
Investors are freely provided with the consulting services of environment, design, construction, completion, works ownership, procedures of customs, tax, banking, accounting, bank loan, investment and construction of warehouses, machinery and equipment, etc.

POSITION

- East: adjoining to provincial road 830
- West: adjoining to Long Cang - Long Dinh road
- North: adjoining to Chanh canal
- South: internal road

 

Distance to traffic hubs

1. From the Industrial Park (IP) to

Center of Ho Chi Minh City: 21 km.

Phu My Hung urban area – Dist. 7, HCM City: 18 km (20 mins)

Green City, Tan An City – Long An: 20 km (20 mins)
2. Road:

National Road 1A => the IP: 0.8 km

Highway of HCMC – Trung Luong => the IP: 2 km

Belt Road 4 => the IP: 2 km

Belt Road 3 (Highway Ben Luc 

Long Thanh) => the IP: 5 km
3. Waterway & Port system:

Vam Co river: 200m in width, 12 – 20m in depth

Bourbon and Hoang Tuan ports: away from the IP 500m, vessel of 5,000 DWT, capacity of 550,000 ton/year

Long An International seaport: far from the IP 28 km – vessel of 50,000 – 70,000 DWT; capacity in 2020: 15 million ton/year

Hiep PhÆ°oc seaport 

Tp. HCM: far from the IP 30 km (road) – vessel of 50,000 – 70,000 DWT, capacity of 200 million ton/year

Cat Lai port – Tp. HCM: far from the IP 35 km, capacity of 70 million ton/year
4. Airway:

Tan Son Nhat Airport – Tp HCM: away from the IP 20 km; capacity: 23 million passengers/year and 600,000 ton of commodities/year

Long Thanh International Ariport – Dong Nai: far from the IP 45 km (Highway of Ben Luc – Long Thanh); capacity of 100 million passengers/year and 5 million ton of commodities/year

INVESTMENT INCENTIVES

Incentive for corporate income tax : 20%

tax exemption for first 02 years and reduction by 50% for the next 04 years

Click here for more information

PERFORMANCE DURATION

Until September 06th, 2061.

LEASING PRICE AND MODE OF PAYMENT

185USD/m2

1. Payment Method for land lease:
- Signing MOU: deposit of 20%
- Issueing an Investment Certificate: payment of 30% (Total: 50%)
- Issueing an Enterprise Registration Certificate: payment of 20% (Total: 70%)
- Signing Contract of Land Lease: payment of 15% (Total: 85%)
- Handover of the land: payment of 10% (Total: 95%)
- Issueing Certificate of Land Use Right: payment of the rest.

FACTORY LEASE PRICE

3-4USD/m2/month

INFRASTRUCTURE MANAGEMENT FEES AND OTHER SERVICES

Infrastructure maintaining fee: Please contact the Sales Department!

WATER RATES

Please contact the Sales Department!

FEE WASTEWATER TREATMENT

Please contact the Sales Department!

ELECTRICITY PRICE

According to the price table of the Government

FUNCTIONAL BLOCK

1. Land for lease: 132 ha
- Land for dyeing and plating industries: 26 ha
- Land for other industries: 95 ha
2. Land for warehouse lease: 11 ha

LAND USE STRUCTURE

Total: 189.843 ha
- Land for factory & warehouse: 130.25 ha (Land for dyeing and plating: 26 ha)
- Land for commercial service: 18.58 ha
- Land for transportation: 19.63 ha
- Land for green trees: 19.04 ha
- Land for engineering: 2.34 ha

SCOPE OF PERMITTED INVESTMENTS

Projects on dyeing and textile
Projects on mechanical engineering and plating
Projects on production of building materials, exception for fibro cement roofing sheet
Projects on traffic and production of asphalt concrete
Projects on energy and production of power wire and cable
Projects on electronics and telecommunication
Projects on exploration, exploitation and processing of minerals
Projects on waste treatment: building up non-toxic industrial waste treatment and disposal facilities
Projects on timber processing, production of glass and ceramic products
Projects on food processing
Projects on processing of agricultural products
Projects on breeding and animal feed processing of cattle, poultry, fishery, except for the project of construction of fishmeal processing facility
Projects on production of chemical fertilizer, pesticide, except for the project of extracting and packaging pesticide
Projects on chemicals, pharmaceuticals and cosmetics
Projects on production of paper and stationery
Other projects, excepting for leather from fresh leather, rubber processing, rubber latex

CLIMATE

- Rainy season: from May to October
- Dry season: From November to April
- Average temperature: 27.2 0C - 27.7 0C
- Annual rainfall: 966 - 1,325 mm
- Average humunity: 80% - 82%
- Annual Average hours of sunshine: 2,500 - 2,800 hours
- Wind: Northeast: frequency of 60 - 70% in dry season; Southwest: frequency of 70% in rainy season.

TOPOGRAPHY AND GEOLOGY

- Handover elevation: 1.85m
- Ground compression: 8 - 10 tons/m2
- Depending on location and area, pile ranges from 8 - 15m

WASTE WATER

According to QCVN 40:2011/BTNMT

FIRE PREVENTION AND PROTECTION

Fire protection system complies with the current regulations of the government

INFRASTRUCTURE

 

TRAFFIC SYSTEM

1. Internal road:
- Asphalt concrete road designed by Vietnam standard H30, is from 16 – 30 m
2. External road:
- Nguyen Trung Truc street is 30m linking the Industrial Park into the National Road no.1A
- Long Cang – Long Dinh street is 24m linking the Industrial Park into Ben Luc town
- The provincial road no.830 is 24m linking the Industrial Park into Long An International seaport

ELECTRICITY SUPPLY SYSTEM

- Ben Luc pawer station, 110/22KV, output 40 + 63MVA
- Rach Chanh – Can Duoc power station, output 40 MVA

WATER SUPPLY SYSTEM

There are four plants supplying water for the IP:
- Go Den water plant: 7,200 m2/day
- Hoang Long water plant: 10,000 m3/day
- Binh Anh water plant: 15,000 m3/day

WASTEWATER TREATMENT SYSTEM

1. Land area: 15,000 m2
- Stage 1: 2,500 m3/day
- Stage 2: 5,000 m3/day
- The pipeline: F 600 – 800
2. Investor treats their wastewater up to B Standard – QCVN 40:2011/BTNMT. The IP continues to treat the wastewater up to A Standard – QCVN 40:2011/BTNMT
3. The IP invests to build a monitoring station to automatically test the wastewater before discharging into Chanh Canal

POST AND TELECOMMUNICATION SYSTEM

The modern telecommunication network is established according to international standards such as MDF, telephone system and high-speed internet connection supplied by the post-telecommunication provider which is able to meet all the investors' requirements.

PUBLIC UTILITIES

Land area: 28 ha including: Custom office, Bank, Post office, Hospital, Schools, Commercial & service centers, restaurants, Canteens, Offices for rent, Sport center, Convention center, Kindergarten, Warehouses, Logistics, etc … are set up in the IP and the residential area

SUPPORTING SERVICES

 

FREE SERVICES

Making applications for all licenses from the beginning to investor's operation.

SUPPORTING SERVICE

- Consulting: Design, construction, completion, ownership of structure, customs, tax, accounting, wastewater treatment …
- Assisting: Recruiting and training, lunch meal, telecommunication, electricity, water, houses …
- Supplying building materials: fresh concrete, drain, pile, floor tile, wall tile, roof tile, sanitary wares, UPVC window, liquid paint … with competitive prices

Contact:

 

National One Stop Services and Investments Organization

Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.

Contact:

  1. Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn