1
|
Name of economic zones, industrial zones, hi-tech parks
|
Nam Cau Kien industrial zone
|
2
|
Location
|
Kien Bai Commune – Thuy Nguyen District – Hai Phong City
|
3
|
Map
|
|
4
|
Scale, land area
|
4.1
|
Planned land area
|
457 ha
+ Period 1: 268 ha
+ Period 2: 189 ha
|
4.2
|
Actual land area
|
|
+ Leased area
|
63 ha
|
|
+ Availble area
|
197 ha
|
4.3
|
Number of enterprises, projects on operating
|
|
+ Domestic enterprises
|
9
|
|
+ FDI enterprises
|
1
|
|
+ Career, major active field
|
|
5
|
Geological advantages
|
5.1
|
Traffic connection
|
Adjacent to No.10 National highway, 5 km far from No.5 National highway. Hai Phong is one of the places which is the most developed heavy industry of Vietnam.
IZ is located in the Center area which has high quality and profuse human resources.
|
5.2
|
Infrastructure
|
|
5.3
|
Other
|
|
6
|
Operation term
|
- Good customer service. Infrastructure cost is free in 6 months to 1 year.
- Flexible investment formality, the investors are supported in license registration of investment.
-To be supported to find partners providing fuel and raw material.
- To be supported to recruit labors
- To be supported to introduce Vietnam policy, consult law at first when investors invest to IZ
|
7
|
Technical infrastructure
|
7.1
|
Power supply system
|
Voltage 110 is depressed to 35 KV with total capacity at 80MVA. 110KV power substation is constructed in IZ; All of substation and 35KV line is invested completely can be connected with parcel of land in anywhere of IZ
|
7.2
|
Water supply and drainage system
|
Water line system which is connected to the fence of the parcel of land is Ф90mm
|
7.3
|
Wastewater, waste treatment system
|
Waste pipe is round precast concrete culvert Ф600 - Ф 1200 mm; Waste treatment plant has capacity of period 1 at 4,000m3/day
|
7.4
|
Telecommunication, internet
|
High-speed ADSL line, Post and telecommunication office is located right in IZ with 1500 numbers
|
7.5
|
Fire prevention and fighting
|
Fire prevention and fighting system is designed synchronously, IZ is circled by conditioning system with lakes, ditches; to convenient for Fire prevention and fighting.
|
7.6
|
Investment situation, finishing infrastructure
|
Total area of period 1 of IZ is 268.32 ha. Round 1 is basically completed, Ground plan of parcel of land is aggraded with 4.2 m in height; The industrial parcel of land is ready for investors.
|
8
|
Human resources
|
8.1
|
Laborers in locality
|
|
8.2
|
Laborers from neighboring areas
|
|
8.3
|
Major training fields
|
Mechanic, electricity, finance, banking, environment, information technology, garment, welding…
|
9
|
Social infrastructure
|
- Schools and training facilities: 4 universities, 7 colleges, 10 vocational schools.
- Security: security system ensures the safest. IZ has constraint with local police.
- Hospital facilities: hospital system from local hospital to central hospital meets the international standard. The closest hospital system is 3 km far from IZ.
- Housing for workers: The projects constructing housing for workers are preferential. IZ has connected to housing for workers system with around local family and neighboring area. It is for workers can rent the houses with the lowest price.
- Other social facilities: The enclosed services are supporting and providing fuel, raw materials, and labor sources.
|
10
|
Support service
|
*Logistics and transportation: IZ has transportation by land service company.
*Finance, banking, insurance: BIDV committed to invest in office building to convenient for the most effective financial supporting of investors.
* Consultant – Audit: The Centers of consultant – audit - law service are linked on duty with IZ.
*Customs: 5 km far from IZ and will be placed in IZ
* Tourism - Travelling – Stay (Hotel, restaurant): The commercial centers, entertainment areas are 15km far from IZ. Golf system is 7km far from IZ, 40 km far from Cat Ba – Ha Long archipelago tourist area; 20km far from Do Son tourist area, 35 km far from ecotourism area, thermal….
|
11
|
Investment attracting sectors
|
11.1
|
Preferential sectors:
|
Industry:
- Electricity, electronic, telecommunication
- precision mechanic
- New material, construction, arts and crafts
- Automatic
- Pharmaceutical product, food.
- Heavy industry, ship supporting
|
11.2
|
Other sectors:
|
Constructing infrastructure – service – Commercial
-Parks, hospital, port, commercial central, entertainment, office building to rent.
|
12
|
Land rental, workshop and infrastructure use expenses
|
12.1
|
Land rental price
|
70-95 USD/m2
|
12.2
|
Workshop rental price
|
3-4USD/m2/month
|
12.3
|
Infrastructure use expense
|
0.48USD/m2/month
|
12.4
|
Payment method
|
By installment. Maximum in 3 installments, not over 18 months
|
13
|
Construction price
|
13.1
|
Office
|
|
13.2
|
Standard workshop
|
|
13.3
|
Other
|
|
14
|
Investment costs
|
14.1
|
Power price
|
Average about: USD0.075/KWh
|
14.2
|
Water price
|
+ For manufacture: in case high quality water is not necessary, it can use surface water and entertainment cost is USD0.15/m3
+ For business – service: USD0.85/m3
+ For living activities: USD0.85/m3
|
14.3
|
Gas and coal price
|
|
14.4
|
House, apartment rental price for foreigners
|
|
14.5
|
Labor cost
|
|
+ Management and Technical workers
|
+ Minimum wage: 129 USD/month
+ Common labors: 130 USD/month
+ Technical workers: 170 USD/month
+ Managers: > 250 USD/month
+ Overtime cost: On Monday to Saturday, average increase 150% and Sunday increase 200% of wage
+ Social, health insurance: 28,5% of wage including 20% of company and the rest 8,5% of labors.
+ Unemployment insurance: 2% of wage including 1% of company and 1% of labors
|
|
+ Worker and unskilled worker
|
|
|
+ Insurance
|
|
14.6
|
Transportation cost
|
|
14.7
|
(Wastewater) waste treatment expenses
|
Domestic waste and industrial waste: USD15-35/m3. Average of Harmful waste: USD300/m3
|
14.8
|
Environmental protection fees
|
|
14.9
|
Customs expense
|
|
14.10
|
Other expenses and fees
|
|
15
|
Contact
|
National One Stop Services and Investments Organization
Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.
Contact:
- Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
- Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn
|