Hoa Khanh Industrial Park

Oct 29, 2021

Hoa Khanh Industrial Park

Investor: Danang Industrial Zones’ Infrastructure Development and Management Company

Location: Hoa Khanh ward, Lien Chieu district, Da Nang city

Area:394 ha

 

1

Name of economic zones, industrial zones, hi-tech parks

HOA KHANH IP

2

Location

Hoa Khanh ward, Lien Chieu district, Da Nang city

3

Legal

Decision No. 343/QD-TTg of the Prime Minister

4

Scale, land area

4.1

Planned land area

394 ha

4.2

Actual land area

 

+ Leased area

303.93ha

 

+ Availble area

0 ha

Occupancy rate: 100%

4.3

Number of enterprises, projects on operating

 

+ Domestic enterprises

    No. of project:s 155

   Registered capital:7,024.16 billion VNĐ

 

+ FDI enterprises

No. of projects:59Registered capital:705.5 million USD

 

+ Career, major active field

 

5

Geological advantages

5.1

Traffic connection

+ 20 km from Tien Sa seaport

+ 10 km from Danang International Airport

+ 5 km from Lien Chieu seaport

+ 13 km from Han River seaport

5.2

Infrastructure

 

5.3

Other

 

6

Operation term

50 years

7

Technical infrastructure

7.1

Power supply system

Power  for production is  distributed all the wayto the project sites.

7.2

Water supply and drainage system

The system is completed and fully meets the demand of investors.

7.3

Wastewater, waste treatment system

The system is completed and is put into operation with a capacity of 5,000m3/day.

7.4

Telecommunication, internet

The branch office of Vietnam Posts and Telecommunications Group (VNPT) is located on road No. 2 of Hoa Khanh IZ. In addition, the representative office of Viettel Group is located on road No. 9 and the broadcast station of Mobiphone is located on Road No.6.

7.5

Fire prevention and fighting

There is a firefighter squad, a part of Danang Firefighting Department, operating in the IZ. There are 51 fire hydrants along all the roads.

7.6

Investment situation, finishing infrastructure

The IZ’s infrastructure has been completed.

8

Human resources

8.1

Laborers in locality

The abundant workforce totally meets the demand of the investors.

8.2

Laborers from neighboring areas

Quang Nam, Thua Thien – Hue…

8.3

Major training fields

 

9

Social infrastructure

Universities, vocational facilities: 06

- University of Danang

+ Danang University of Technology

+ Danang University of Education

+ Danang University of Foreign Language

+ Danang University of Economics

- Duy Tan University

- Dong A University

- Danang University of Architecture

- Danang University of Physical Education and Sports

- Danang University of Medical and Pharmacy Technology

Colleges: 14

Professional secondary schools: 7

Vocational Training Centers: 59

- Main majors: Mechanics Engineering; Mechanical Engineering; Chemical Engineering; Environmental Engineering; Electrical Engineering; Information Technology; Electronic and Telecommunication Engineering; Building Automation Technology; Informatics; Automation; Economics and Business; Pharmacy; Nursing; Clinical Practice; Community Health; Foreign Languages...

Security: There is Hoa Khanh IZ Police station. Besides, Daizico also has the IZ Administration and Services subdivision which serves to maintain, repair and ensure safety in the IZ. 

Hospitals: None

Accommodations for workers:

- At Hoa Khanh IZ with the area of 4,848m2

- At Hoa Hiep 4 Rehabilitation (Hoa Hiep Nam Ward, Lien Chieu District) with the area of about 42,784m2

- At Hoa Tho – Hoa Nhon area, bordering Hoa Cam IZ to the south (Hoa Tho Tay Ward, Cam Le District), with the area of about 18,811m2

+ Other social infrastructure: There is an area close to Hoa Khanh IZ reserved for investors to build social accommodation for workers.

10

Support service

Logistics and transportation: Kerry Integrated logistics Co., ltd. is located in the IZ and specializes in logistics and transporting freights.

Finance - Banking - Insurance: There are many banks located in the IZ including: Bank of Investment and Development of Vietnam, Agribank, Export-Import Bank

Consulting - Auditing: None

Customs: Address 363 - Nguyen Luong Bang (100m from Hoa Khanh IZ)

Tourism - Transportation - Accommodation (hotels, restaurants): There are many restaurants, hotels near Hoa Khanh IZ. Xuan Thieu Resort is 2km, and Ba Na-Suoi Mo Resort is 5km away from the IZ.

11

Investment attracting sectors

11.1

Preferential sectors:

Hi-tech sectors

11.2

Other sectors:

Electronics, mechanics, automobile mechanics, and other sectors…

12

Land rental, workshop and infrastructure use expenses

12.1

Land rental price

Pursuant to Decision No. 799/QD-UBND dated January 20th, 2012.

+ Annual payment: VND 12,600/m2/year

+ Every 10-year payment: VND 11,600 /m2/year

+ Every 20-year payment: VND 10,500 /m2/year

+ Every 30-year payment: VND 9,500 /m2/year

+ One – off payment for the entire leasing period: VND 8,400/m2/year

12.2

Workshop rental price

 

12.3

Infrastructure use expense

VND 4,200/m2/year

12.4

Payment method

10 years, 20 years, 30 years, one-off payment

13

Construction price

13.1

Office

Not available

13.2

Standard workshop

Not available

13.3

Other

 

14

Investment costs

14.1

Power price

Pursuant to Decision No. 4887/2014/QD- BCT dated 29/5/2014, the power cost for industrial zones (VAT excluded): File attachment

14.2

Water price

(pursuant to Decision No. 46/2010/QD-UBND dated December 20th, 2012) (VAT included)

+ For production provision: VND 8,100/m3

+ For trade- services provision: VND 12,200/m3

14.3

Gas and coal price

Not available

14.4

House, apartment rental price for foreigners

Not available

14.5

Labor cost

 

+ Management and Technical workers

negotiable 

 

+ Worker and unskilled worker

Minimum wage: VND 2,500,000 /person/month

 

+ Insurance

negotiable 

14.6

Transportation cost

Not available

14.7

(Wastewater) waste treatment expenses

Pursuant to Decision No. 1495/QD-UBND dated February 26th, 2012. Company pays wastewater treatment cost in accordance with the level of COD in the wastewater it discharges into the IZ’s sewage system as follows:

+ COD≤200mg/l - unit price: VND 3,630 /m3

+ COD≤400mg/l - unit price: VND 7,760 /m3

+ COD≤1,000mg/l - unit price: VND 9,375 /m3

+ COD≤1,500mg/l - unit price: VND 1,500 /m3

Note: The above-mentioned price includes environment protection fee, and VAT.

14.8

Environmental protection fees

VND 630 /m3, which is included in the wastewater treatment unit price 

14.9

Customs expense

 

14.10

Other expenses and fees

 

15

Contact

National One Stop Services and Investments Organization

Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.

Contact:

  1. Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn