POSITION
|
- North: An Ha canal
- East: Binh Loi, Binh Chanh District, HCMC
- West: Hai Son industrial zone.
Distance to traffic hubs
To National Highway 1A 11km
17 km to the center of Ho Chi Minh City
25 km to Tan Son Nhat International Airport
3 km to center of Duc Hoa
4 km to Vam Co Dong river
Hai Son Industrial Park is connected to the important roads such as Highway 1A, Xuyen A highway, Saigon
Trung Luong freeway, Provincial Road 825, 830 ...
Convenient roa raffic and waterway for transporting goods and supplies from the Industrial park to ports, neighboring provinces and Cambodia.
|
SCOPE OF PERMITTED INVESTMENTS
|
Mechanical, metallurgy; textile, apparel; food processing, beverages; chemical manufacturing, pharmaceuticals, cosmetics; type processing, glass manufacturing, ceramics; electronics manufacturing, telecommunications; Group projects in electronics, telecommunications: the manufacture of tools, equipment and components for electrical, electronics and telecommunications, project manufacturing household electrical equipment, cable production project communication; group projects on mechanics, metallurgy: projects that build, repair and assembly of rolling automotive, motorcycle, project manufacturing, assembly, repair, motorcycle, industrial engineering projects : manufacture of machinery, equipment and spare parts for industry, agriculture, forestry (not a stage of molding, forging, plating), project rolling aluminum and steel from ingot materials (non-public paragraph smelting, plating), projects production of metal products and fabricated metal products from raw materials embryo (not a stage of cooking, preparation, plating), projects production of motor vehicles and other means of transport; group projects on weaving, dyeing and garments: Knitwear (not reduce weight, not dyed), the project produced textiles, textile, apparel, footwear; Project group on chemicals, pharmaceuticals, cosmetics: PP production of plastic resins, production of packaging, pharmaceutical production, chemical production projects cosmetics: Detergents, project bottling and packaging vaccines and veterinary drugs (no mixing stage), projects production of paints used in construction, project manufacturing plastics, rubber and plastic products, rubber plastic materials, plastic scrap (unprocessed latex); group projects in woodworking, glass, ceramics: woodworking projects, artificial plywood, wood substitute materials, production of ceramic products, glass; group projects food processing, beverage: food processing projects, food production projects bottled water, beverage, chemical transfer projects, production projects ice, projects to extract, bartender; Other group projects including concrete mixers, welding rod production, packaging and printing, medical equipment manufacturers, materials furnishing, household plastic, project manufacturing jewelery, furniture imitation jewelery and related details, the project of printing and reproduction of recorded media, project leasing warehouse, factory Built with the correct lines on the nature of the zone trades were approved, storage of goods, logistics, business exhibitors and products, project manufacturing, new materials, equipment manufacturing projects, spare parts for electricity production.
|
TRAFFIC SYSTEM
|
Industrial Park Road Network:
* Main road:
- Hai Son - Tan Do street is connected to Provincial road 825 11mx2 wide, wide range separates 2m wide sidewalks 4,5mx2.
- Street No. 2: 16m road presence, wide sidewalks 5mx2, width of 36m, the length of 1.583m.
- Road No. 4: 16m road presence, wide sidewalks 5mx2, width of 36m, length 1.670m.
- Road No. 7: 16m road presence, wide sidewalks 5mx2, width of 36m, the length of 1.448m.
- Road No. 9: 16m road presence, wide sidewalks 5mx2, width of 36m, the length of 1.522m.
- Road No. 10: with 16m road surface, sidewalks 5mx2, width of 36m, the length of 1.483m.
* Secondary road:
- Road No. 1: 14m wide road presence, wide sidewalks 4mx2, width of 32m, 660m length
- Road No. 3: 14m wide road presence, wide sidewalks 4mx2, width of 32m, length 1.306m
- Road No. 5: 14m wide road presence, wide sidewalks 4mx2, width of 32m, length 1.383m
- Road No. 6: 14m wide road presence, wide sidewalks 4mx2, width of 32m, length 1.314m
- Road No. 8: 14m wide road presence, wide sidewalks 4mx2, length 1.356m.
|