Binh Tan Industrial Park

Jul 22, 2021

BINH TAN INDUSTRIAL PARK

Investor: Vinh Long Industrial Park Management Board. 

Location: Thanh Loi commune, Binh Tan district, Vinh Long province.

Area:  400ha

1

1. Location:         

- Location in the province: Thanh Loi commune, Binh Tan district, Vinh Long province.

- Location in the area: far from the city. Can Tho 18 km, City. Vinh Long 37km, City. Ho Chi Minh City 171km.

- Distance from Airport: Can Tho Airport is about 28 km.

- Distance from the port: + Binh Minh port within Binh Minh Industrial Park: 13 km, receiving ships with a tonnage of up to 10,000 tons.

+ Vinh Long port: 37 km, receiving ships with a tonnage of up to 5,000 tons.

+ Can Tho port: 28km, receiving ships with a tonnage of up to 20,000 tons.

- 7km from 1 National Highway 1A.

 

2

3.2. Scale:  400 ha;

3.3. Investment capital to build technical infrastructure:  100% capital of investors.

 

3

3.5. Industry attracting investment:  Processing agricultural products - food, processing vegetables and fruit products; Seafood processing; Products from livestock; Industry of consumer goods, textiles, handicrafts, electronic assembly industry, packaging, pharmaceutical industry - cosmetics, mining industry and other construction material production...; Warehousing, service and some other industries with less environmental pollution….

 

4

Internal traffic system:  reasonably designed to ensure smooth traffic throughout the industrial park. The system is designed as follows:

+ The main roads in the industrial park are 40 m wide - 4 lanes

+ Branch roads in the industrial park are 22 m wide - 2 lanes

All internal roads are designed and constructed in strict compliance with national regulations, and finished with Asphalt asphalt. The internal roads are also equipped with a complete, aesthetic high-pressure lighting system

 

5

Power supply system:  The power supply to the industrial park is taken from 110/35/22KV substation. High voltage electricity network is provided along the internal traffic in the industrial park.

Water supply system:  Clean water is supplied with a capacity of 30,000 m3 per day from the clean water plant. Water is supplied to the factory fence by an international standard water supply pipe system.

Waste water and waste treatment system: Waste  water is collected to the wastewater plant of the industrial park to meet water standard A (QCVN 40:2011/BTNMT) before being discharged to the general system of the industrial park. The wastewater plant was built with a treatment capacity of 2,900m3/day – night

Waste is contracted by factories in the industrial park to classify, collect and transport garbage out of the industrial park to avoid environmental pollution.

Exhaust gases of factories are installed with national standard filtration systems before being discharged into the natural environment

Communication system:  the industrial park is installed with an underground communication cable system and is provided to the fence of the factory by an international standard cable system.

Through the connection system between the communication center of the industrial park through the post and telecommunications network, all communication needs are guaranteed and are capable of providing all necessary services such as: Private switchboard , international telephone, teleconference, leased line, high speed internet, email, etc.

Fire prevention and fighting system:  the industrial park is installed with a warning, prevention and fire fighting system in strict compliance with national regulations.

Fire hydrants are installed at the internal traffic hubs, and at all factories to ensure effective protection of the whole area from fire and explosion incidents.

 

6

  • Management fee :

Industrial park management fee : 0.5 USD/m2/year. This fee is paid annually in the first month of the year

Electricity fee : 0.1 USD during peak hours/ 0.05 USD during normal hours/ 0.03 USD during off-peak hours

Clean water usage fee : 0.40 USD/m3. The amount of clean water used is calculated according to the reading on the water meter

Waste water & solid waste treatment fee : $0.28/m3. Pre-treatment quality requirement is grade B after treatment is grade A

 

7

National One Stop Services and Investments Organization

Office: Parkview, 5A Huu Nghi Ave, VSIP 1, Binh Hoa Ward, Thuan An City, Binh Duong.

  1. Ms Hien Do – 0908 069 399 – hien.dt@nso.com.vn
  2. Mr Cuong Phan – 0913 855 528 – cuong.pd@nso.com.vn
  3. Ms. Truc Tran – 0396 296 580 – truc.tn@nso.com.vn

 

           

 